Doubleview Gold Corp. Announces Successful Completion of 2025 Drilling Season at the Hat Project, the Largest Drill Season yet with 13,290m Diamond Drill Core

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to announce the completion of its 2025 drilling season at the Hat Polymetallic Project in northwestern British Columbia. This year’s program marks the largest drilling campaign in the Hat Project’s history, with 13,290 metres drilled across 19 drill holes, achieving a 100% success rate with every drill hole intersecting mineralization, while confirming the deposit remains open to depth and laterally.

The 2025 campaign delivered major advancements in our understanding of the geology and dimensions of the Hat deposit, including the identification of a newly recognized mineralized horizon located beneath and adjacent the 2024 conceptual open-pit shell. Importantly, mineralization domains were better defined, existing data gaps were closed, and the Company’s evolving geological and resource models were validated (see Figures 1-4, also available on the Company’s website at www.doubleview.ca).

Assays from holes H100 through H108 remain pending and will be released once received, reviewed, and interpreted in accordance with NI 43-101.

Highlights of the 2025 Drill Season

  • 13,290 metres drilled in 19 holes, averaging 699.5 metres per hole — the largest and most efficient and technically productive program ever.
  • A newly discovered deep mineralized horizon beneath the 2024 conceptual pit outline confirms significant down-dip continuity and expansion potential as mineralization remains open at depth and laterally in multiple directions.
  • Every drill hole intercepted mineralization, demonstrating the strength and continuity of the porphyry system.
  • H097, H098, and H099, previously disclosed, extended mineralization by 200-300 metres down-dip and up to 100 metres laterally, significantly improving the block model and geological interpretation.
  • H099 returned 438 m of 0.40% CuEq, including 52 m of 1.02% CuEq, another one of the strongest continuous intervals drilled at the Hat to date.
  • Newly completed holes H100-H108 were strategically positioned to evaluate depth extensions, lateral continuities, and untested model gaps. Core samples from these drill holes are being processed at the independent assay lab.
  • Pending assays for nine remaining holes will inform updates to the Mineral Resource Estimate (MRE-2) and the ongoing Preliminary Economic Assessment (PEA)Note: Due to timing issues, we may not be able to include all assay data in those technical reports.
  • 2025 work further advances Doubleview’s understanding of copper-gold-cobalt-scandium mineral domains. The recently-announced potential scandium recovery achievements are a major milestone for the Hat’s critical-metals profile.

Farshad Shirvani, President & CEO, commented:

This has been a transformational year for Doubleview and the Hat Project. Our 2025 drill campaign successfully demonstrated the strength of our geological model, filled key data gaps, and uncovered an entirely new mineralized horizon beneath the 2024 conceptual pit shell. Every drill hole intersected mineralization, which is a testament to the quality and strength of our technical team, along with the robustness of the system.

The discovery potential at Hat continues to expand, with the deposit remaining open both laterally and at depth. Combined with last year’s exceptional drill results, our scandium recovery breakthrough, and the ongoing work toward the updated Resource Estimate and PEA, we are entering the next phase of project development with a high degree of confidence and momentum. I extend my thanks to our technical team, contractors, and shareholders for enabling the most successful drilling season in our Company’s history.”

The Company is now focused on completing the assay review and disclosure for drill holes H100 through H108, which represent the final nine holes of the 2025 program. Assay results, when received, verified, and interpreted in accordance with NI 43-101 standards, will be announced and incorporated into the geological and resource models.

In parallel, the Company continues to advance its Preliminary Economic Assessment (PEA), which is currently undergoing both internal modelling and external third-party review. The integration of the full 2025 drill dataset, including pending assays, is expected to materially enhance the confidence and robustness of the forthcoming PEA, supporting a comprehensive evaluation of the Hat Project’s economic potential and paths to development.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_001.jpg

Figure 1: Drill plan and 2025 Extension around the 2024 Conceptual Pit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_002.jpg

Figure 2: 2025 drilling, mineralization extension at depth and around the 2024 conceptual pit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_003.jpg

Figure 3: 2024 Conceptual pit shell in 3D and 2025 drill holes demonstrating the strategic exploration in 2025

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_004.jpg

Figure 4: 2024 Conceptual pit shell in 3D and 2025 drill holes demonstrating the strategic exploration in 2025

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/277248_9efb9102e4f63b8e_004full.jpg

Doubleview maintains a website at www.doubleview.ca.

Qualified Persons:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the technical contents of this news release. He is not independent of Doubleview as he is a shareholder in the company.

About Doubleview Gold Corp

Doubleview Gold Corp. is mineral resource exploration and development company headquartered in Vancouver, British Columbia, Canada. It is publicly traded on the TSX-Venture Exchange (TSXV: DBG), (OTCQB: DBLVF), (WKN: LA1W038), and (FSE: 1D4). Doubleview focuses on identifying, acquiring, and financing precious and base metal exploration projects across North America, with a strong emphasis on British Columbia. The company enhances shareholder value through the acquisition and exploration of high-quality gold, copper, cobalt, scandium, and silver projects-collectively critical minerals utilizing cutting-edge exploration techniques.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:



Open Pit Model Hat


Resource Category


Tonnage
Average GradeMetal Content
CuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion 
lb
million lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details of the MRE, please refer to the Company’s July 25, 2024 news release.

On behalf of the Board of Directors,
Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Certain of the statements made and information contained herein may constitute “forward-looking information.” In particular references to the private placement and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/277248

Doubleview Extends High-Grade Domains at Hat: H099 Returns 438m of 0.40% CuEq Including 52m of 1.02% CuEq, Expanding Mineralization Envelope Around Conceptual Pit Vertically and Laterally

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to announce assay results from drill holes H097, H098, and H099 from its 2025 drill program at the Hat Polymetallic Deposit in northwestern British Columbia. Drill holes H097, H098 and H099 were collared from the same platform as drill holes H093-H096 and were drilled into previously untested potential extensions of the deposit and have successfully expanded the mineralized footprint approximately 100m laterally and 200 meters vertically and strengthened confidence in continuity in part of the Lisle Zone.

Highlights

  • H099 returned 438.0 metres of 0.40% CuEq, including 52.0 metres of 1.02% CuEq, representing one of the strongest continuous mineralized intervals drilled at the Hat deposit to date.
  • H097 and H098 confirm mineralization in previously undrilled sections and extend data approximately 200-300 metres down-dip and up to 100 metres laterally and fill important gaps in the geological exploration model. Drill holes H097, H098 and H099 when integrated into the database potentially will extend the 2024 conceptual open-pit shell by ~200 metres down-dip and up to 100 metres laterally, and demonstrate strong expansion potential that may be realized in the revised version of the 2024 Mineral Resource Estimate (MRE-2) and the Preliminary Economic Assessment (PEA).
  • Drill hole analyses reported in this News Release show continuity of copper-gold-cobalt-scandium domains [scandium is an emerging critical metal and an important component of the Hat deposit], across broad intervals of the system.
  • These drill holes support the Company’s objective to complete an up-dated Mineral Resource Estimate (MRE-2) and a Preliminary Economic Assessment (PEA) and improve confidence in the exploration model all of which will be incorporated in the current and future engineering studies *Copper Equivalent (CuEq) values exclude scandium (Sc2O3).*

Table 1: Summary of Significant % CuEq Drill Core Intercepts

Summary of Significant Drill Core Intercepts

DDH From (m)To (m)Length (m)CuEq (%) Excl. Sc2O3Ag (g/t)Au (g/t)Co (g/t)Cu (%)Sc (g/t)
H097 30.8476.0445.30.200.180.0962.10.1028.1
H097Including112.8258.0145.20.250.240.1285.30.1225.5
 Including209.0279.070.00.290.340.1089.80.1725.3
 Including387.0422.035.00.360.210.1460.50.2221.6
H098 45.0438.0393.00.270.250.1077.50.1627.9
 Including288.0436.0148.00.410.340.1273.20.2830.9
 Including290.0433.0143.00.420.340.1273.70.2831.0
H099 72.0715.0643.00.340.210.1662.60.1829.9
 Including210.0648.0438.00.400.250.1767.50.2330.4
 Including312.0648.0336.00.470.290.2067.90.2731.5
 Including362.0457.395.30.610.510.1891.00.4230.6
 Including586.0687.0101.00.640.250.3549.90.3132.4
 Including586.0676.790.70.680.240.3852.20.3331.5
 Including586.0638.052.01.020.340.5867.20.4828.3

Notes:                         

1 – Copper Equivalent (CuEq) currently does not include Scandium

2 – The intervals presented in this table are not true widths. The true width of mineralized sections has not been determined.

3 - Metal equivalents should not be relied upon for future evaluations. Drill hole intercepts included in this news release are core lengths that may or may not represent true widths of mineralization. It is not possible to determine true widths.

4 – Parameters used to calculate Copper Equivalent: Au price (US$/oz): 2365.09; Ag price (US$/oz): 27.43; Cu price (US$/lb): 4.17; Co price (US$/lb): 14.76. Au recovery: 89.0%; Ag recovery: 68.0%; Cu recovery: 84.0%; Co recovery: 78.0%. * Copper Equivalent Calculation CuEq in % = ([Ag grade in ppm] *27.43*0.68/31.1035 + [Au grade in ppm] *2365.09*.89/31.1035 + 0.0001* [Co grade in ppm] *14.76*0.78*22.0462 + 0.0001* [Cu grade in ppm] *4.17*0.84*22.0462)/(4.17*22.0462*0.84).

Drill intercept overview:
H099438.0 m at 0.40% CuEqIncluding: 52.0 m at 1.02% CuEqIncluding: 95.3 m at 0.61% CuEqIncluding: 336.0 m at 0.47% CuEq     In 643 m at 0.34% CuEq
H098393.0 m at 0.27% CuEqIncluding: 148.0 m at 0.41% CuEq
H097445.3 m at 0.20% CuEqIncluding: 145.2 m at 0.25% CuEq

These long intercepts continue to demonstrate and explore the dimensions of the horizontal and vertical porphyry-style Hat deposit mineralization enriched in copper, gold, cobalt, silver, and scandium.

Geological Interpretation

Step-Out Drilling Adds Increased Volumes

H097-H099 were planned to intersect previously undrilled areas between and beneath the trace of previously released drill holes (H093-H096). Although collared from the same surface location, the drill holes highlighted in this News Release extended the dimensions of the deposit 200-300 metres at depth and up to 100 metres laterally, successfully fulfilling the objective of characterizing untested volumes of the deposit.

Expansion of Conceptual Pit Potential

The strong continuity and grade distribution observed in drill hole H099, together with similar results from H097 and H098, extend the interpreted geometry of the mineralized body and potentially allow major extensions of the conceptual pit by approximately 200 metres vertically and ~100 metres laterally. Note: the current exploration model and conceptual pit design are based on available information and may not be supported by future drilling and engineering studies.

Continuity & Resource Confidence

The drill holes included in this News Release were planned to improve the interpretation of deposit geology and strengthen the block model used for resource estimates. The results confirm both lateral and vertical continuity of the system and will contribute to higher confidence resource categories as the model is updated.

High-Grade Domains and Depth Potential

Drill hole H099 is particularly important as it highlights a strongly mineralized area of copper, et al. metals, including more than 50 metres exceeding 1.0% CuEq, and demonstrates that high-grade zones continue to depth. The extent of such high-grade zones has not been determined.

Critical Metals: Scandium & Cobalt

While scandium (Sc2O3) is not included in CuEq calculations, scandium grades remain consistent with prior drill campaigns and continue to frame the Hat Deposit as a potentially significant North American source of critical metals.

CEO Comments

Farshad Shirvani, President and CEO, commented:
“These new step-out holes continue to validate and strengthen our geological model of the Hat Deposit. H099, in particular, delivered exceptional continuity with long and high-grade sections, confirming that the Lisle Zone remains robust at depth. The drilling extended mineralization into untested areas and demonstrated expansion potential for the conceptual pit by approximately 200 metres down-dip and 100 metres laterally.

These results reaffirm our confidence in the Hat model, highlight the presence of high-grade domains, and demonstrate meaningful depth potential. Importantly, the new holes help us improve resource confidence and will be incorporated into the upcoming resource estimation work. We are very encouraged by the consistent scandium and cobalt values across the system, strengthening Hat’s profile as a strategic critical-metals project in British Columbia. Our team is already planning follow-up drilling into several newly opened areas.”

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/276907_7723e6e3145a690d_001.jpg

Figure 1 – Drill Plan Map

A surface plan map showing locations of H097, H098, and H099 relative to earlier holes (H090-H096), plotted on top of the 3D Induced Polarization (IP) chargeability model. The map illustrates the central Lisle Zone, the 2024 conceptual pit outline, and the new volumetric extensions identified through the 2025 drilling.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/276907_7723e6e3145a690d_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/276907_7723e6e3145a690d_002.jpg

Figure 2 – Section View Through H099

A north-south vertical cross-section through H099 showing down-hole CuEq grades, highlighting the 438 m mineralized interval and the high-grade 52m zone exceeding 1.0% CuEq. The section illustrates how the reported drill holes extend mineralization 200-300 m below prior interpretation and opens new areas for follow-up.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/276907_7723e6e3145a690d_002full.jpg

Other notes:

Details of the algorithm used to estimate %CuEq are presented in the notes above. The metal values used in our current algorithm are average trailing three years commodity prices, and do not reflect recent dramatic increases in prices of mineral commodities. Scandium recovery has been announced in the news release dated 25th of November 2025 with an overall pre-optimized 82%.

Core samples are delivered securely to a fully accredited commercial laboratory and processed by industry-standard methods and include insertion of standard samples, duplicate core samples and blank samples to ensure confidence.  Assays are received from the analytical laboratory at irregular intervals, verified by reference to notes provided by our field crew, added to our database, and disseminated publicly by News Release.   

“The scandium resource potential is based on the drill holes on the property drilled for (July 25, 2024) maiden resource estimate for other metal content than scandium. The potential quantity and grade are conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

Table 2: Drill hole locations

DDH IDUTM-East (m)UTM-North (m)Elevation (m)Azimuth (°)Dip (°)Max-Depth (m)Year
H0973479636453927966348.0-86.26392025
H0983479636453927966251.0-87.46332025
H0993479636453927966190.0-76.07382025

Quality Assurance and Quality Control:

Hat Project drill cores are processed at Doubleview’s field camp where they are photographed, measured and logged by our technical staff and then divided using a diamond bladed saw. One half is placed in a stout bag to form the assay sample that is forwarded securely to the independent analytical lab. The remaining half core is stored on site where it is available for further examination and sampling. The assay cores are subject to a Chain of Custody routine as they are shipped from camp to a bonded carrier for delivery to the lab.

All core samples are prepared and analyzed at AGAT Laboratories in Calgary, an independent ISO 17025 and ISO 9001 certified facility. Samples are dried, crushed to 70% passing 2 mm, split to obtain a 250 g representative portion, and pulverized to 85% passing 75 µm. Gold, platinum, and palladium are assayed by 30-50 g fire assay with ICP-OES finish. Multi-element analyses (up to 48 elements) are performed by four-acid digestion with ICP-OES/MS, with ore-grade assays applied where required. Selected samples are further analyzed for whole-rock oxides using lithium borate fusion with ICP-OES, and Loss on Ignition is determined separately. Routine quality assurance protocols include insertion of blanks, duplicates, and certified reference materials, ensuring accuracy and reliability of results.

Doubleview maintains a website at www.doubleview.ca.

Qualified Persons:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the technical contents of this news release. He is not independent of Doubleview as he is a shareholder in the company.

About Doubleview Gold Corp

Doubleview Gold Corp. is mineral resource exploration and development company headquartered in Vancouver, British Columbia, Canada. It is publicly traded on the TSX-Venture Exchange (TSXV: DBG), (OTCQB: DBLVF), (WKN: LA1W038), and (FSE: 1D4). Doubleview focuses on identifying, acquiring, and financing precious and base metal exploration projects across North America, with a strong emphasis on British Columbia. The company enhances shareholder value through the acquisition and exploration of high-quality gold, copper, cobalt, scandium, and silver projects-collectively critical minerals utilizing cutting-edge exploration techniques.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

   Average GradeMetal Content
Open Pit Model HatResource CategoryTonnageCuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion lbmillion lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details of the MRE, please refer to the Company’s July 25, 2024 news release.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Certain of the statements made and information contained herein may constitute “forward-looking information.” In particular references to the private placement and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276907

Doubleview Provides Cobalt Resource Summary for the Hat Polymetallic Deposit in Advance of Updated MRE and PEA

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: A1W038) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to provide a summary of the cobalt component of its Hat Polymetallic Deposit in northwestern British Columbia, in advance of the upcoming updated Mineral Resource Estimate (“MRE”) and Preliminary Economic Assessment (“PEA”). Based on the Company’s review of publicly available information, the Hat Deposit may contain one of the largest undeveloped cobalt inventories associated with a Canadian mineral deposit.

The Hat Deposit Maiden Mineral Resource Estimate, released July 25, 2024, outlined a large alkalic porphyry type copper-gold-cobalt-scandium resource, within which cobalt occurs as a by-product metal uniformly associated with copper and pyrite mineralization. The cobalt component of the resource is summarized as follows:

  • Indicated: 150 million tonnes containing 28 million pounds (approximately 12,700 tonnes) of cobalt at 0.008% Co
  • Inferred: 477 million tonnes containing 91 million pounds (approximately 41,300 tonnes) of cobalt at 0.009% Co

The Hat Deposit contains one of the more significant undeveloped cobalt-containing mineral resources in Canada. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Cobalt is consistently distributed throughout the alkalic porphyry system alongside copper, gold, silver, and scandium. Metallurgical testwork to date indicates that cobalt is efficiently liberated into a clean pyrite concentrate suitable for conventional downstream processing. Additional metallurgical work is ongoing.

Farshad Shirvani, President & CEO, commented: “Copper, gold, and scandium remain the primary value drivers at the Hat Deposit, but the cobalt content represents a meaningful additional component of the project’s critical-minerals profile. As demand for secure and responsibly sourced battery metals continues to rise, the Hat Deposit’s location in a Tier-1 jurisdiction and its unusually large cobalt endowment strengthen the project’s long-term relevance. As we complete the updated MRE and advance our PEA, cobalt will be one of several important contributors evaluated in the broader economic framework.”

Why Cobalt from Hat Matters

Cobalt is designated a critical mineral by Canada, the United States, the European Union, Australia, Japan, and the United Kingdom. It is essential for:

  • High-performance lithium-ion batteries
  • Superalloys used in aerospace and defense
  • Clean-energy technologies including wind, fuel cells, and emerging grid-storage systems

More than 70% of refined cobalt is processed in China, and most mine supply originates from the Democratic Republic of Congo. Western governments and industry groups are seeking secure, ethical, and transparent supply chains. Canada currently produces only minor by-product cobalt amounts. The Hat Deposit has the scale, continuity, and jurisdictional advantages to potentially contribute to future domestic supply should the project advance through the necessary evaluation and development stages.

Qualified Person

Erik Ostensoe, P.Geo., a consulting geologist and Doubleview’s Qualified Person as defined by NI 43-101, has reviewed and approved the technical disclosure in this news release. Mr. Ostensoe is not independent of Doubleview as he is a shareholder of the Company.

About the Hat Polymetallic Deposit

The Hat Deposit is located in northwestern British Columbia and is a large alkalic-porphyry system hosting significant copper, gold, cobalt, and scandium mineralization. The project has been advanced through multiple exploration campaigns, geophysical surveys, metallurgical test programs, and drill programs targeting expanded resource potential. An updated MRE and PEA are underway and expected before the end of 2025.

Open Pit 
Model Hat
Resource CategoryTonnageAverage GradeMetal Content
CuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion lbmillion lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium Exploration Target

The Hat Deposit also hosts a previously disclosed exploration target of 300-500 million tonnes averaging approximately 40 ppm (0.004%) Sc₂O₃.

“The scandium resource potential is based on the drill holes on the property drilled for (July 25, 2024) maiden resource estimate for other metal content than scandium. The potential quantity and grade are conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.”

A NI 43-101 Technical Report supporting the 2024 MRE is filed on SEDAR+.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

Forward-Looking Statements

This news release contains forward-looking statements that involve risks and uncertainties. Forward-looking statements relate to expectations, beliefs, projections, and future events and are based on current assumptions as of the date of this news release. Forward-looking statements include, but are not limited to, statements regarding: anticipated timing of the updated Mineral Resource Estimate and Preliminary Economic Assessment; interpretations of the cobalt component of the Hat Deposit; metallurgical results; the potential for future production; and the potential significance of cobalt, scandium, and other metals to the project’s economic considerations.

Forward-looking statements are subject to various risks and uncertainties that may cause actual results to differ materially, including: exploration and development risks; changes in commodity prices; environmental, permitting, and regulatory risks; risks inherent to metallurgical testwork; uncertainties in geological interpretations; and other risks described under the Company’s filings on SEDAR+. Readers should not place undue reliance on forward-looking statements. Except as required by law, the Company undertakes no obligation to update forward-looking statements.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276613

Doubleview Gold Corp. Achieves a Major Breakthrough in Scandium Recovery from Copper Porphyry Tailings

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: A1W038) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to announce positive first-phase pre-optimization results from its two-year, novel scandium-focused metallurgical test program. These results confirm the technical viability of recovering high-purity scandium oxide alongside copper, gold, cobalt, and other metals from the Company’s 100%-owned flagship HAT polymetallic deposit in northern British Columbia.

This breakthrough development marks a global first: The successful recovery of scandium from copper porphyry flotation tailings to a scandium oxide product.

The primary objective of this extensive test program, conducted at SGS Canada Inc., was to establish a viable proprietary flowsheet enabling scandium to be included in the upcoming, updated mineral resource estimate and preliminary economic assessment, potentially as measured, indicated, or inferred resources. The Company’s maiden resource estimate (July 25, 2024) highlighted a scandium potential of 300 to 500 million tonnes grading approximately 40 ppm Sc2O3.

“The scandium resource potential is based on the drill holes on the property drilled for (July 25, 2024) maiden resource estimate for other metal content than scandium. The potential quantity and grade are conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.”

Early metallurgical test work demonstrated that scandium could be extracted from copper flotation tailings. Subsequently, through an innovative robust test work programme at SGS Canada Inc., it has been successfully demonstrated that scandium in flotation tailings can be recovered to a high purity di-scandium tri-oxide product (Sc2O3).

Key metallurgical results include:

  • Primary scandium extraction (leach): 82%
  • Overall scandium recovery to high-purity Sc2Oproduct: 88%

Future work to advance the Hat project will focus on continuous pilot plant testing and further optimization to improve primary extraction and enhance final product purity.

Farshad Shirvani, President and CEO of Doubleview Gold Corp., stated:

“Today’s results are a game-changer for the HAT project and potentially for the entire scandium industry on the world stage. World scandium supply is severely limited although there are several scandium projects currently being considered for development. Our metallurgy program shows that at HAT, we can recover high-value scandium directly from the tailings of a standard copper flotation circuit, using acid produced from internally generated pyrite. If the HAT project advances to production, scandium could become a high-margin bonus on top of a potential world-class copper-gold-cobalt operation.

Now that we’ve established the technical viability of scandium recovery, the next steps will focus on pushing extraction and overall recovery as high as possible through continued optimization and pilot-scale testing. I could not be more excited about what the future holds for Doubleview shareholders and all our stakeholders.”

The pictures below show the first Scandium Oxide (Sc2O3) produced from the Hat Deposit in the lab. Doubleview now plans to continue its metallurgical optimization program to enhance the recovery of scandium and other metals, including copper, cobalt, gold, and silver, which are critical for the upcoming prefeasibility study.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/275884_4b60eef9a4ae6b97_001full.jpg

Photo 1: Scandium Oxide (Sc2O3) from the Hat deposit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/275884_4b60eef9a4ae6b97_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/275884_4b60eef9a4ae6b97_002.jpg

Photo2: Scandium Oxide (Sc2O3) from the Hat deposit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/275884_4b60eef9a4ae6b97_002full.jpg

Qualified Person:

EUR ING Andrew Carter B.Sc., CEng., MIMMM (QMR), MSAIMM, SME, Doubleview’s Qualified Person with respect to the HAT Project metallurgical studies as defined by National Instrument 43-101, has reviewed and approved the technical content of this news release and is independent of the Company.

What is Scandium?

Scandium (Sc) , (atomic weight 45.10, density 2.5), a close relative of the Rare Earth elements, possesses exceptional properties when alloyed with other metals, particularly aluminum. It is lightweight, corrosion-resistant, and as an alloy is capable of dramatically improving strength, heat resistance, and weldability without adding significant weight. When combined with aluminum, scandium forms alloys that achieve the strength of steel while maintaining the light weight of aluminum, enabling revolutionary applications in transportation, aerospace, and clean energy. Scandium’s scarcity, produced in limited quantities globally, primarily as a byproduct, makes it a high-value critical mineral, with prices often exceeding $5,000 per kilogram. Its applications span aerospace, defense, and increasingly, the clean energy sector, where it plays a pivotal role in advancing sustainable technologies. Global scandium resources are dominated by projects in Australia and northern Europe. Canadian deposits potentially can allow diversity of supply within a stable and mature mining jurisdiction.

About Doubleview Gold Corp

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is a Canadian resource company advancing the 100%-owned Hat Polymetallic Project, located in the prolific Golden Triangle of northwestern British Columbia. The Hat hosts a large copper-gold-cobalt-scandium porphyry system with significant critical metal potential. Doubleview is dedicated to responsible exploration, Indigenous engagement, and sustainable development that benefits both shareholders and local communities.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

For more information, please visit: www.doubleview.ca

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

Open 
Pit 
Model Hat
  Average GradeMetal Content
Resource CategoryTonnageCuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion 
lb
million 
lb
million 
lb
thousand
oz
thousand
oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details of the MRE, please refer to the Company’s July 25, 2024 news release.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including without limitation: the size of the Private Placement and other statements concerning the Private Placement; the anticipated use of proceeds from the Private Placement; the renunciation to the purchasers of FT Shares and timing thereof; the tax treatment of the FT Shares and the Company’s plans regarding exploring its mineral exploration properties; anticipated results of geophysical drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company’s prospects, properties and business detailed elsewhere in the Company’s disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management’s estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company’s expectations or projections.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/275884

Doubleview Gold Corp. Highlights Scandium Potential at Hat Project, a Key Enabler for the Electrification Economy

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”), is a leading Canadian exploration company that is currently finalizing a Preliminary Economic Assessment (PEA) and updated Preliminary Resource Estimate (MRE) at its Hat Critical and Strategic Metals deposit in the so-called Golden Triangle of northwestern British Columbia. This News Release discusses the importance of Scandium, an important component of the Hat deposit.

The Hat deposit hosts significant scandium potential estimated at 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3, representing one of the world’s largest undeveloped scandium deposits. Doubleview anticipates releasing results from its 2-year metallurgical analysis program in the immediate future when details are received from its metallurgical consultants and laboratories. The Company anticipates the analysis will confirm high scandium recovery rates and enable its inclusion in the upcoming updated Mineral Resource Estimate (MRE) and Preliminary Economic Assessment (PEA), both of which are expected to be finalized before the end of 2025. As the global shift toward electrification accelerates, scandium emerges as a vital material for enhancing energy efficiency and supporting clean technologies. The Hat Project, with its unique polymetallic profile including copper, gold, cobalt, silver, and scandium, positions Doubleview to contribute significantly to this transition.

What is Scandium?

Scandium (Sc), (atomic weight 45.10, density 2.5), a close relative of the Rare Earth elements, possesses exceptional properties when alloyed with other metals, particularly aluminum. It is lightweight, corrosion-resistant, and as an alloy is capable of dramatically improving strength, heat resistance, and weldability without adding significant weight. When combined with aluminum, scandium forms alloys that achieve the strength of steel while maintaining the light weight of aluminum, enabling revolutionary applications in transportation, aerospace, and clean energy. Scandium’s scarcity, produced in limited quantities globally, primarily as a byproduct, makes it a high-value critical mineral, with prices often exceeding $5,000 per kilogram. Its applications span aerospace, defense, and increasingly, the clean energy sector, where it plays a pivotal role in advancing sustainable technologies. Global scandium resources are dominated by projects in Australia and northern Europe. Canadian deposits potentially can allow diversity of supply within a stable and mature mining jurisdiction.

The Hat Project: A Significant Scandium Deposit

At Doubleview’s Hat Project scandium is hosted by a large scale alkalic porphyry system that is one of the world’s very few scandium-bearing deposits. Recent drilling and resource updates, including the maiden Mineral Resource Estimate released in July 2024 and subsequent expansions announced in October 2025, have confirmed an increased footprint and potential volume for the polymetallic deposit. The Hat Deposit is distinguished by its robust mineralization, with scandium occurring with what the Company anticipates being economically viable concentrations of copper, gold, cobalt, and silver. Doubleview’s exploration, including mapping and geophysical and geochemical surveys and more than 100 drill holes, has outlined shallow and deep mineralized horizons, that confirm the deposit’s scale and its potential to become a leading source of base and precious metals, including not only copper and gold but also cobalt, silver and scandium.

Advanced Metallurgy and High Recovery Rates

Doubleview has made significant investment in metallurgical test work in support of its Hat Project with the objective of optimizing the efficient extraction and recovery of its component metals. High recoveries will enhance project economics by maximizing value from the ore. Notably, the Company’s ongoing metallurgical studies, as highlighted in recent progress updates, will refine these techniques further, ensuring environmentally responsible and cost-effective production.

Doubleview believes its Hat deposit’s polymetallic nature and physical characteristics offer a unique and very valuable advantage as scandium can be recovered as a secondary product alongside primary gold and copper production. The by-product concept minimizes incremental costs, leveraging the same mining and milling operations to unlock scandium’s value. By treating scandium as an enhancement to the core copper-gold operation, Doubleview can achieve diversified revenue streams while maintaining operational efficiency, transforming what could be a standalone challenge into a synergistic opportunity.

Scandium’s Value in the Electrification Economy

In the rapidly growing electrification economy, scandium may play a transformative role by enabling lighter, more efficient, and durable materials essential for electric vehicles (EVs), renewable energy systems, and advanced power generation. When alloyed with aluminum, scandium creates super-strong, lightweight composites that reduce vehicle weight by up to 20-30%, extend EV battery range, and improve overall energy efficiency. Outstandingly this is critical for the transportation industry’s push toward zero-emission where every gram saved translates to greater sustainability and cost savings.

Beyond EVs, scandium as a catalyst is a key component in solid oxide fuel cells (SOFCs), which generate clean electricity from hydrogen or natural gas with high efficiency and low emissions. Scandium-stabilized zirconia electrolytes in SOFCs enhance ionic conductivity, lower operating temperatures, and increase cell lifespan, making them ideal for distributed power generation in data centers, industrial facilities, and microgrids. As governments worldwide invest in hydrogen infrastructure and fuel cell technologies to meet net-zero goals, demand for scandium is projected to surge, potentially outstripping current global supply of around 15-20 tons annually. The Hat Project’s scandium resources align perfectly with this demand, offering a secure, domestic source to support the world’s clean energy ambitions.

Scandium represents a game-changer for Doubleview and the broader electrification landscape,” said Farshad Shirvani, President and CEO of Doubleview Gold Corp. “Our Hat Project not only bolsters Canada’s critical minerals strategy but also positions us to deliver high-value materials that drive innovation in clean energy and transportation.”

Doubleview continues to advance the Hat Project through drilling, metallurgical optimization, and resource expansion, with plans for more updates in the coming weeks. Our metallurgical consultants will provide further progress reports that we will share in new releases.

About Doubleview Gold Corp
Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is a Canadian resource company advancing the 100%-owned Hat Polymetallic Project, located in the prolific Golden Triangle of northwestern British Columbia. The Hat hosts a large copper-gold-cobalt-scandium porphyry system with significant critical metal potential. Doubleview is dedicated to responsible exploration, Indigenous engagement, and sustainable development that benefits both shareholders and local communities.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

For more information, please visit: www.doubleview.ca.

Qualified Persons:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the technical contents of this news release. He is not independent of Doubleview as he is a shareholder in the company.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

   Average GradeMetal Content
Open Pit Model HatResource CategoryTonnageCuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion
lb
million lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details of the MRE, please refer to the Company’s July 25, 2024 news release.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including without limitation: the size of the Private Placement and other statements concerning the Private Placement; the anticipated use of proceeds from the Private Placement; the renunciation to the purchasers of FT Shares and timing thereof; the tax treatment of the FT Shares and the Company’s plans regarding exploring its mineral exploration properties; anticipated results of geophysical drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company’s prospects, properties and business detailed elsewhere in the Company’s disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management’s estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company’s expectations or projections.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/275302

Doubleview Gold Corp. Closes Final Tranche of Non-Brokered Private Placement for Gross Proceeds of $7,181,400

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (the “Company” or “Doubleview”) is pleased to announce that it has closed the second tranche of its previously announced non-brokered private placement (the “Private Placement”) announced on November 7, 2025.

The second tranche consists of 2,016,286 units (the “Units”) at a price of $0.70 per Unit for aggregate gross proceeds of $1,411,400. Each Unit consists of one common share (a “Share”) and one common share purchase warrant (a “Warrant”). Each Warrant entitles the holder to purchase one additional Share at a price of $1.00 for a period of 24 months from the date of issue, subject to an accelerated expiry provision whereby the Company may accelerate the expiry date if the volume-weighted average trading price of the Shares on the TSX Venture Exchange is $1.25 or greater for any ten (10) consecutive trading days.

Combined with the first tranche that closed on November 7, 2025, the Company has now raised total gross proceeds of $7,181,400 under the Private Placement.

Insider Participation and Related Party Transaction

A director of the Company participated in the second tranche by subscribing for 350,000 Units ($245,000), representing approximately 17.3% of the second tranche. This participation constitutes a “related party transaction” within the meaning of Multilateral Instrument 61-101 — Protection of Minority Security Holders in Special Transactions (“MI 61-101”). The Company is exempt from the formal valuation and minority shareholder approval requirements of MI 61-101 pursuant to sections 5.5(a) and 5.7(1)(a), as the fair market value of the securities issued to the director does not exceed 25% of the Company’s market capitalization.

In connection with the second tranche, the Company paid finder’s fees to Research Capital Corporation consisting of $44,100 in cash and 63,000 non-transferable finder’s warrants issued on the same terms as the Warrants forming part of the Units.

All securities issued pursuant to the second tranche, including securities issued as finder’s fees, are subject to a statutory four-month and one-day hold period expiring March 19, 2026.

The Private Placement, including the insider participation described above, is subject to final acceptance of the TSX Venture Exchange.

Proceeds from the Private Placement will be used to advance the Company’s exploration program on its British Columbia projects, particularly the polymetallic Hat Project located in northwestern British Columbia, and for general working capital purposes.

About Doubleview Gold Corp

A mineral resource exploration and development company is headquartered in Vancouver, British Columbia, Canada. It is publicly traded on the TSX-Venture Exchange (TSXV: DBG), (OTCQB: DBLVF), (WKN: A1W038), and (FSE: 1D4). Doubleview focuses on identifying, acquiring, and financing precious and base metal exploration projects across North America, with a strong emphasis on British Columbia. The company enhances shareholder value through the acquisition and exploration of high-quality gold, copper, cobalt, scandium, and silver projects-collectively critical minerals-utilizing cutting-edge exploration techniques.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

About the Hat Polymetallic Deposit
The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:


Open 
Pit 
Model 
Hat


Resource Category
TonnageAverage GradeMetal Content
CuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion 
lb
million 
lb
million 
lb
thousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details, please refer to the Company’s July 25, 2024 news release.

Qualified Person:
Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the written technical disclosure contained in the news release. He is not independent of Doubleview as he is a shareholder in the company.

On behalf of the Board of Directors,
Farshad Shirvani, President & Chief Executive Officer

For further information please contact:
Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including without limitation: the size of the Private Placement and other statements concerning the Private Placement; the anticipated use of proceeds from the Private Placement; the renunciation to the purchasers of FT Shares and timing thereof; the tax treatment of the FT Shares and the Company’s plans regarding exploring its mineral exploration properties; anticipated results of geophysical drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company’s prospects, properties and business detailed elsewhere in the Company’s disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management’s estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company’s expectations or projections.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/275145

Doubleview Gold Corp Announces Non-Brokered Private Placement of Flow-Through Shares at $1.00 per share along with Non-Flow-Through Units

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (the “Company” or “Doubleview”) is pleased to announce a non-brokered private placement of flow-through shares and non-flow-through units for gross proceeds of up to C$10,000,000 (the “Private Placement”). Proceeds of the Private Placement shall be used to fund the current exploration program and general working capital. Proceeds of the sale of the FT Shares will be used for exploration work on its BC projects, particularly for the polymetallic Hat Project, located in northwestern BC. This work includes drilling, geological advisory and analytical services as well as other development work and other “Canadian exploration expenses” that qualify as “flow-through mining expenditures” (as such terms are defined in the Income Tax Act (Canada) (the “Tax Act”)).The flow-through portion of the Private Placement will consist of up to 5,000,000 flow-through Shares (“FT shares “) at a price of $1.00 per FT share for up to C$5,000,000.

Additionally, the Company will issue up to 7,142,857 hard dollar units (“non-FT Units”) at a price of $0.70 per non-FT Unit, for up to C$5,000,000. Each non-FT Unit will consist of one common share and one full Warrant at an exercise price of $1.00 for 24 months from the date of issue. Each Warrant shall be subject to an accelerated expiry date at the option of the Company in the event the ten (10) day volume-weighted average price of the common shares of the Company on the TSXV for any ten (10) consecutive trading days is $1.25 or more.

Pursuant to applicable Canadian securities laws and in accordance with the TSX Venture Exchange policies, all securities issued under this Offering will be subject to applicable resale restrictions under applicable securities laws and to the Exchange hold period of four-months and one day from the date of issuance. In connection with the Private placement, Doubleview may pay a finder’s fees in accordance with the policies of the TSXV consisting of cash and/or finder’s shares.

The closing of the Offering is subject to receipt of all necessary regulatory approvals including the TSX Venture Exchange

About Doubleview Gold Corp

A mineral resource exploration and development company is headquartered in Vancouver, British Columbia, Canada. It is publicly traded on the TSX Venture Exchange (TSXV: DBG) (OTCQB: DBLVF) (WKN: A1W038) and (FSE: 1D4). Doubleview focuses on identifying, acquiring, and financing precious and base metal exploration projects across North America, with a strong emphasis on British Columbia. The company enhances shareholder value through the acquisition and exploration of high-quality gold, copper, cobalt, scandium, and silver projects-collectively critical minerals-utilizing cutting-edge exploration techniques.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

Open Pit Model HatResource CategoryTonnageAverage GradeMetal Content
CuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion lbmillion lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details, please refer to the Company’s July 25, 2024 news release.

Qualified Person:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the written technical disclosure contained in the news release. He is not independent of Doubleview as he is a shareholder in the company.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including without limitation: the size of the Private Placement and other statements concerning the Private Placement; the anticipated use of proceeds from the Private Placement; the renunciation to the purchasers of FT Shares and timing thereof; the tax treatment of the FT Shares and the Company’s plans regarding exploring its mineral exploration properties; anticipated results of geophysical drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company’s prospects, properties and business detailed elsewhere in the Company’s disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management’s estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company’s expectations or projections.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/272690

Doubleview Gold Corp Announces 320-Meter Eastward Extension at the Hat Polymetallic Deposit, Expanding Mineralized Volume and Remaining Open

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to report that ongoing drilling at its 100%-owned Hat Polymetallic Deposit in northwestern British Columbia has extended the mineralized system approximately 320 meters eastward, further confirming that the deposit remains open in multiple directions. The 2025 exploration program continues to expand the mineralized envelope, with results expected to contribute significantly to the upcoming Mineral Resource Estimate (MRE).

2025 Exploration Program Highlights

To date in 2025 drill program, the Company has completed more than 10,200 meters of drilling in 14 holes. The focus has been to step out from the known resource limits to prove continuity and scale. Key results from this phase of the program include:

  • Significant Extension: Drill holes H100 through H102 have successfully extended the deposit’s footprint more than 320 meters eastward, confirming that the high-volume porphyry-style mineralization remains open and undefined in this direction.
  • Consistent Mineralization: Mineralization has been intersected in every hole completed in the 2025 program, validating the geological model and suggesting strong continuity of the mineralizing system.
  • Resource Inclusion: The entire drill database to hole H101 will be included in the revised MRE, anticipated for release in 2025. The expanded footprint with stronger assay data and strong visuals as illustrated in the accompanying core photo gallery, is expected to allow a meaningfully increased resource estimate.

The 2025 drilling program comprises more than 10,200 meters in 14 holes and the observed mineralization has been extended more than 320 metres to the east. The interpreted mineralization and the apparent growth in volume provide strong support for the forthcoming MRE that is scheduled for completion within the next 60 days. Fresh assays are being received almost daily from the laboratory and will be released when processed by our technical team.

“These new drill results represent a major step forward in understanding the true scale of the Hat Deposit,” said Farshad Shirvani, President and CEO of Doubleview Gold Corp. “The 320-meter eastward extension, combined with probable continued mineralization beyond the current limits of drilling, highlights the significant expansion potential of the system and positions Doubleview for a meaningful resource upgrade.

“The Hat Deposit, characterized by its copper-gold-cobalt-scandium association, continues to demonstrate robust continuity of mineralization and growing tonnage potential. Drilling to date indicates a broad, strongly mineralized system with elevated scandium and copper values that support the Company’s strategy to define one of North America’s largest critical-metal-bearing polymetallic deposits. Important amounts of gold, cobalt and silver are present.

A detailed drill section and plan map illustrating the newly expanded mineralized area are provided below. In addition, a gallery of approximately 60 core photographs from recently completed, non-reported holes accompanies this release. The Company anticipates announcing assay results from these holes as soon as analytical data are received, validated, and interpreted.”

IMPORTANT VISUAL DISCLOSURE: The visual observations of mineralization, including core photos, are preliminary in nature and are not a substitute for assay results. The Company cautions that visual estimates of mineralization are not indicative of the actual grade or economic viability of the resource. Assay results are pending for the core included in the photos and will be published once received, verified, and analyzed under the Company’s strict Quality Assurance/Quality Control (QA/QC) program.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/271591_b1e46f8114db4806_001.jpg

Figure 1: Drill Plan with the Induced Polarization Plan and 2024 Conceptual Pit Outline, showing the new extensions.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/271591_b1e46f8114db4806_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8003/271591_b1e46f8114db4806_002.jpg

Figure 2: Section on H093 to H096, H100 to H102, and 2024 Conceptual Pit Outline 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/271591_b1e46f8114db4806_002full.jpg

Core Photo Gallery: The following images are showing a few mineralization intervals of the H097 to H102:



To view the enhanced versions of these graphics, please visit:
https://www.doubleview.ca/core-samples-h100-to-h102/

About Doubleview Gold Corp
Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is a Canadian resource company advancing the 100%-owned Hat Polymetallic Project, located in the prolific Golden Triangle of northwestern British Columbia. The Hat hosts a large copper-gold-cobalt-scandium porphyry system with significant critical metal potential. Doubleview is dedicated to responsible exploration, Indigenous engagement, and sustainable development that benefits both shareholders and local communities.

Doubleview’s success is deeply rooted in the unwavering support of its long-term shareholders, supporters, and institutional investors. Their ongoing commitment has been instrumental in advancing the company’s strategic initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome active participation from its valued stakeholders as the company expands its portfolio and strengthens its position in the critical minerals sector.

For more information, please visit: www.doubleview.ca

Qualified Persons:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the technical contents of this news release. He is not independent of Doubleview as he is a shareholder in the company.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

   Average GradeMetal Content
Open Pit Model HatResource CategoryTonnageCuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion lbmillion lbmillion lbthousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details of the MRE, please refer to the Company’s July 25, 2024 news release.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Certain of the statements made and information contained herein may constitute “forward-looking information.” In particular references to the private placement and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/271591

Doubleview Gold Corp Initiates Advanced Exploration Program at Red Spring, Bolstering Its Critical Minerals Portfolio

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (WKN: LA1W038) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to announce the commencement of an advanced exploration program at its 90%-owned copper-silver-zinc-gold Red Spring Project, located in central British Columbia, Canada. This initiative marks a significant step in unlocking the project’s full potential and reinforces Doubleview’s commitment to critical mineral development.

Red Spring Project: Inaugural 3D IP Survey Underway

The Red Spring Project, a pillar in Doubleview’s expanding portfolio, is situated in a highly prospective region of central British Columbia, Canada. The Company holds a 90% interest in this compelling copper-silver-zinc-gold project, which has demonstrated strong mineralization in historical drilling, particularly in its central zone. Decades of previous operator activities, including sampling, geophysical surveys, and approximately 4,000 feet of drilling, have laid the groundwork for Doubleview’s current advanced exploration. The project is strategically important to the Company as it strengthens its emphasis on critical minerals.

The first phase of Doubleview’s 2025 exploration program at the Red Spring property comprises an inaugural 3D Induced Polarization (IP) survey. This state-of-the-art three-dimensional geophysical survey will target the Angus Zone, an area of high interest previously sampled and prospected by the Company. The survey is expected to be completed by the end of August 2025.

The 3D IP survey will provide valuable insights into the subsurface geology and will contribute to planning and guiding future drill programs. Farshad Shirvani, President and CEO of Doubleview Gold Corp, commented: “Due to significant third-party interest in the Company’s flagship HAT project, management is strategically advancing exploration at its Red Spring Project, as it has consistently demonstrated strong potential, both historically and through Doubleview’s past exploration efforts. The 3D IP program will provide detailed information and valuable insights with minimal environmental impact. Our goal is to gain a better understanding of the deposit, expand the area of interest, and help define precise targets for further work, including drilling. The Red Spring Project is an important component in Doubleview’s portfolio of properties and emphasizes our focus on critical minerals.”

Doubleview is dedicated to collaborative engagement with local stakeholders and First Nations and strives to apply sustainable exploration methods that ensure minimal land impact.

Hat Polymetallic Deposit Update

Exploration and definition of Doubleview’s flagship Hat Project continues with 2025 drilling surpassing 6,500 meters. Drill hole H099, currently in progress, is approaching the significant 100 drill hole milestone. The preliminary economic assessment (PEA), metallurgy, and environmental baseline studies are continuing and underscore the comprehensive advancement of this significant polymetallic deposit.

About Doubleview Gold Corp

With active programs at both the HAT and Red Spring projects, Doubleview anticipates that 2025 will be its most productive year to date, reflecting the Company’s robust and exciting exploration and development activities.

Doubleview Gold Corp, trading on the TSX-Venture Exchange (TSXV: DBG) (OTCQB: DBLVF) (WKN: LA1W038) (FSE: 1D4) is a Canadian-based mineral resource exploration and development company focused on the discovery and advancement of high-value mineral deposits in British Columbia. The Company controls a portfolio of prospective mineral properties, including the Hat polymetallic deposit and the Red Spring copper-gold-silver project.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact: Doubleview Gold Corp Vancouver, BC Farshad Shirvani President & CEO T: (604) 678-9587

E: corporate@doubleview.ca

Website: www.doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Certain of the statements made and information contained herein may constitute “forward-looking information”. In particular references to the private placement and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/260280

Doubleview Gold Corp Provides Comprehensive Update on Its Flagship Project – the Polymetallic Hat Deposit

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (WKN: LA1W038) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to provide a detailed update on its 100%-owned polymetallic Hat Deposit strategically located in northwestern British Columbia, Canada.

Polymetallic Hat Deposit  Momentum Builds for Resource Enhancement and Scandium Metallurgy

The Company is currently executing its most extensive field activities to date at the Hat Project. The 2025 drill campaign is well underway and seamlessly connecting to the successes of the previous seasons, significantly advancing our geological understanding and laying a robust foundation for an updated mineral resource estimate which will be part of the preliminary economic assessment.

In the Company’s ongoing 2025 exploration program, Doubleview has completed 4,500 meters of diamond drilling across 7 new holes, with an average depth of approximately 665 meters. This includes drill hole H096, which impressively reached a total depth of 922.5 meters. These efforts have successfully targeted intended zones within the deposit, providing invaluable information for resource modeling and estimation. The drill core photos at the end of this news release show a few select mineralization intercepts.

Looking ahead, the next phases of drilling will focus on evaluating the eastern edges and reaching into the deeper parts of the Hat deposit, with the objective of further expanding the known mineralization footprint and understanding the genesis of the deposit.

Scandium Recovery Studies — A Strategic Priority

Given the critical importance of scandium — a highly sought-after rare earth mineral in North America — Doubleview is placing special emphasis on its extraction and recovery from Hat deposit with the objective of developing an achievable process to produce an economical and marketable product.

Three accredited professional metallurgical facilities are independently conducting parallel testwork on the Hat Deposit’s samples. Diverse methodologies are employed during the bulk processing by each entity. While final results are anticipated, interim meetings and discussions have been extremely encouraging, suggesting significant recovery potential for scandium. These studies are integral to the mineral resource evaluation and will define the best marketable product.

Preliminary Economic Assessment (PEA)

The Preliminary Economic Assessment (PEA) for the Hat Deposit is currently underway across several disciplines. This includes incorporating the updated Mineral Resource Estimate (MRE) Version 2, which will integrate all drill hole results of the 2024 drill campaign. Many other aspects of the mineral deposit’s final modeling and evaluation are simultaneously progressing. Notably, scandium would potentially be added to the resource evaluation, which could further enhance the project’s economic outcome. The completed PEA will represent the conclusion of the due diligence process for several interested parties that may potentially join the Company in developing the Hat Deposit.

Environmental and Permitting Pathway Advances

In a forward-looking initiative, Doubleview commissioned environmental baseline studies to a leading engineering company. This work includes the design of an environmental permitting road map for the Hat Project. The goal is to ensure all data is collected within the guidelines of relevant future permitting processes. This early-stage information is vital for forthcoming advanced studies designed to help the project progress efficiently.

Archaeological Impact Assessment studies (AIA) have successfully been completed and accepted by the Archaeology Branch of British Columbia. The presented results of these studies are an important step in journey of the development of the Hat Project.

Executive Commentary:

Farshad Shirvani, M.Sc., Geology, President and CEO of Doubleview Gold Corp:

“Our commitment to advancing critical mineral projects is unwavering. The ongoing work at our Hat deposit, from aggressive drilling to pioneering scandium metallurgy, underscores our dedication to creating long-term value for all stakeholders. We are building a robust foundation for the future, strategically positioning Doubleview at the forefront of the polymetallic and critical minerals landscape in British Columbia.

The exciting developments at the Hat Project have garnered significant interest with globally leading investment entities, sovereign wealth funds, as well as top-tier mining companies who envision themselves as pillars of the future of critical metals, such as scandium, copper and cobalt. This led to promising high-level discussions with these interested parties. We find ourselves at a unique juncture, and I strongly believe we are diligently exploring all opportunities presented to us to maximize our shareholders’ success.”

Drill core photos of a few select mineralization intercepts



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img1.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img2.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img3.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img4.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img5.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img6.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img7.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img8.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img9.jpg



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8003/259000_img10.jpg

About Doubleview Gold Corp

Doubleview Gold Corp, TSX-Venture Exchange (TSXV: DBG) (OTCQB: DBLVF) (WKN: LA1W038) (FSE: 1D4). is a Canadian-based mineral resource exploration and development company focused on the discovery and advancement of high-value mineral deposits in British Columbia. The Company controls a portfolio of prospective mineral properties, including the Hat polymetallic deposit and the Red Spring copper-gold-silver project.

About the Hat Polymetallic Deposit

The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources of copper, gold, cobalt, and the potential for scandium. As one of the region’s significant sources of critical minerals, the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate, as of the recently completed Mineral Resource Estimate and the Company’s July 25, 2024, news release, is summarized below:

Open 
Pit 
Model 
Hat
Resource Category
Tonnage
Average GradeMetal Content
CuEqCuCoAuAgCuEqCuCoAuAg
Mt%%%g/tg/tmillion 
lb
million
 lb
million
 lb
thousand ozthousand oz
In PitIndicated1500.4080.2210.0080.190.421,353733289292,045
Inferred4770.3440.1850.0090.150.493,6191,945912,3287,575

Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm (0.004%) Sc2O3.

For further details, please refer to the Company’s July 25, 2024 news release.

Qualified Person:

Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved the written technical disclosure contained in the news release. He is not independent of Doubleview as he is a shareholder in the company.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO

T: (604) 678-9587
E: corporate@doubleview.ca

Website: www.doubleview.ca

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Certain of the statements made and information contained herein may constitute “forward-looking information.” In particular references to the private placement and future work programs or expectations on the quality or results of such work programs are subject to risks associated with operations on the property, exploration activity generally, equipment limitations and availability, as well as other risks that we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/259000